A selection of the work our crews have completed for property managers, contractors, and industrial owners across Southern California.
A six-building East LA office park was quoted a full TPO tear-off estimated at $1.6M with an 8-week schedule that would have required tenant relocation on three of the buildings. Our team specified a high-solids silicone restoration in place, installed at 30-mil dry film thickness with a full 15-year manufacturer NDL warranty.

Full traffic coating replacement on a 4-level post-tensioned garage adjacent to the coast. Night and weekend phasing kept the garage open through the entire 32-day schedule.

Shot-blast prep and 100% solids epoxy floor system installed over three consecutive weekends around active distribution operations.

Negative-side crystalline waterproofing plus polyurethane crack injection to stop chronic water intrusion in a 1960s subterranean garage feeding an occupied office tower.

Full cut-and-replace re-caulk of 18,000 linear feet of curtain-wall perimeter joints on a 22-story office tower, with documented ASTM C1521 adhesion testing.

Concrete spall repair, waterproof membrane, and traffic coating on 88 balconies for an HOA closing out its SB 326 inspection cycle.

Acrylic elastomeric cool-roof recoat on 210,000 sq ft, meeting Title 24 reflectivity requirements and CRRC-rated for utility rebate qualification.